Securing Stephenson Street Flood Defence Project with Blue Light CCTV

Griffiths Contractors in collaboration with National Resources Wales (NRW)

Securing Stephenson Street Flood Defence Project with Blue Light CCTV

Newport

Griffiths Contractors embarked on a significant infrastructure project aimed at constructing a robust flood defence system in Stephenson Street, Newport. This region had long been susceptible to flooding, making it imperative to implement effective security measures to protect valuable assets on-site. Working hand-in-hand with National Resources Wales (NRW), Griffiths Contractors sought a security solution to mitigate the risks of theft, trespassing, and vandalism across multiple sites spanning several miles.

Stephenson-Street-inpage
challenges

Geographical Complexity: The project covered a vast area, and it included numerous site setups and compounds, each housing essential equipment like plant machinery, fuel, and tools. These assets were not only potential targets for organised crime but also for opportunistic criminals.

Remote Locations: Some site locations lacked access to on-site power infrastructure, making traditional security solutions impractical.

Duration of the Project: With a project timeline spanning nearly three years, it was vital to maintain the security system’s efficiency over an extended period.

Solutions

Customised CCTV Deployment: At Blue Light Services we devised a tailored security solution by deploying CCTV systems across multiple sites. Due to the geographical complexity, 4×4 vehicles were used to transport and install these systems in remote locations.

Innovative Power Supply: In areas lacking traditional power sources, our team deployed our Solar CCTV Towers with Fuel Cell technology powered by methanol. These units can operate for an impressive six-month duration before requiring methanol replenishment.

Comprehensive Coverage: Recognising the high crime rate in the area, we conducted site meetings, surveys, and Risk Assessments. This allowed us to identify the precise security requirements for each site, ensuring that all assets and areas were comprehensively covered by the CCTV systems.

Proactive Maintenance: To maintain system efficiency throughout the project’s duration, we integrated state-of-the-art hardware and software into each unit. These systems continuously monitor the health of the CCTV system, providing advanced warnings of potential issues. This proactive approach ensures the security systems remains fully operational and effective.

 

0
AUDIBLES

Sounding the Alarm: Our audible messages through camera units proved their worth, deterring potential crimes and keeping your safety our top priority.

0
ALARMS

Raising the Alarm: Our proactive alarms raised throughout the month led to successful crime preventions, safeguarding your security 24/7.

0
Camera(S)

360-Degree Watchdog: Our camera units, each equipped with up to 4 cameras, provide a complete 360-degree view, leaving no blind spots and ensuring comprehensive surveillance.

0
HOURS

Continuous Vigilance: Our dedicated team provides round-the-clock monitoring and surveillance, ensuring your site’s security 24 hours a day, 365 days a year.

results & benefits

Since the implementation of Blue Light Services’ security solution:

Zero Incidents: The project has experienced no thefts or damages on-site, a testament to the effectiveness of the security measures put in place.

Ongoing Protection: The CCTV systems continue to safeguard the project’s assets, preventing theft, trespassing, and vandalism.

High Praise: The project’s management has commended the security measures in place, highlighting their role in maintaining site integrity.

Conclusion: Blue Light Services’ tailored security solution, incorporating innovative technology and proactive maintenance, has successfully protected Griffiths Contractors’ Stephenson Street Flood Defence Project. This case study illustrates the importance of customised security solutions in safeguarding valuable assets in challenging environments over extended project timelines.

Case Studies
Griffiths Contractors took on the ambitious task of transforming the existing A road into a dual carriageway, spanning 1.5 kilometers
Bendcrete Leisure Limited partnered with the Vale of Glamorgan Council to embark on an exciting project – the design and construction …
Centregreat Ltd undertook a critical urban regeneration project in Pill, a town known for its high crime rates and deteriorating conditions